Skip to content
ArkanDoIMPORT • EXPORT • BROKERAGE • SOURCING
Industrial · B2B TRADE DOSSIER

Industrial Spare Parts

A buyer-side, zero-to-handover dossier for overseas companies sourcing Industrial Spare Parts from Iran: definition and indicative HS family, Iranian source mapping, quality, RFQ, inspection, evidence, pricing/Incoterm, logistics and customs handover.

Indicative HS familyComponent-dependent
Common forms / gradesOEM, approved equivalent, obsolete or custom-made parts
Typical packagingSupplier-specific protective or export packing
Decision evidencePart number, drawing revision, data sheet, material certificate and traceability
Core RFQ inputPart number, manufacturer, revision, drawing, quantity, urgency and substitution limits
Dossier structureClassification → source → quality → RFQ → inspection → evidence → price → compliance → logistics & customs

1) Commercial definition & customs classification

Indicative HS family: Component-dependent. Use it only as a research starting point; final classification must be confirmed against the exact product form, current origin/destination tariff and the transaction's customs adviser.

2) Form, grade & acceptable range

A generic name for Industrial Spare Parts is not enough for offer comparison. Select the required form or grade from OEM, approved equivalent, obsolete or custom-made parts and define the standard, end use, tolerance and rejection/acceptance limits.

3) Producer map & seller role

Establish whether the counterparty is the producer, authorised representative, distributor or trader. Legal identity, production/storage location, realistic capacity and relationship to the lot should be traceable.

4) Quality, sample & acceptance criteria

Part number, manufacturer, revision, critical dimensions, material and operating conditions should be fixed before supplier search. Define sampling, laboratory or inspector, acceptance limits and the buyer-side final approval authority before contract.

5) A priceable RFQ

The RFQ should at minimum include Part number, manufacturer, revision, drawing, quantity, urgency and substitution limits. Any substitution in grade, source, packaging or standard should be presented as a separate alternate offer for explicit approval.

6) Sampling, inspection & pre-shipment control

For sensitive lots, agree the sampling point and timing, seal method, quantity/quality inspection, package and batch/heat reconciliation, and the conditions for issuing the inspection report before loading.

7) Documents & evidence chain

Core evidence may include Part number, drawing revision, data sheet, material certificate and traceability. Check issuer, date, revision, batch/heat/shipment reference and the decision each document supports; a long certificate list disconnected from the lot has limited decision value.

8) Packaging, storage & loading

Typical packaging: Supplier-specific protective or export packing. Match package strength, net/gross weight, marking, palletisation or securing, moisture/contamination sensitivity and destination handling to the transport route.

9) Price, Incoterm & landed comparison

OEM or equivalent status, MOQ, tooling, lead time, inspection and transport method drive price and decision quality. Separate currency, Incoterm and named place, weight/quantity basis, duties/taxes, inspection, packing, inland logistics, international freight and destination costs from the commodity price.

10) Payment, parties & compliance

Screen seller and payment beneficiary, signatory authority, beneficiary account, banking/transport constraints, sanctions and origin/destination legal requirements for the specific transaction. This public guide is not legal or banking advice.

11) Export handover & customs file

Before cargo moves, assign responsibility for invoice, packing list, certificate of origin, product permits/certificates, export declaration and customs coordination, inspection, freight booking and document handover. Exact requirements depend on product and destination.

12) Common failures & stop signals

Counterfeit parts, wrong revisions, visual similarity without functional fit and missing traceability are key risks. Pressure for immediate payment, sudden beneficiary changes, unreferenced evidence, non-representative samples or refusal to answer technical questions should trigger a stop and further review.

Questions to resolve before discussing price

  • Does the RFQ clearly include Part number, manufacturer, revision, drawing, quantity, urgency and substitution limits?
  • Has the final HS classification plus origin/destination permits and controls been confirmed for the exact product form?
  • What sampling or quality-control method and approval authority will apply?
  • What currency, Incoterm, named place and weight or quantity basis apply to price?
  • Which documents are required before payment, before loading and for destination clearance?
  • How will rejection, correction, damages or dispute resolution work if the lot is non-conforming?

Important note: This page is general preparation material and does not imply inventory, a firm price or supplier approval.

Next move

Submit the blockage—the solution starts there.

Describe the specification, volume, urgency and result you need.